|
Awards & Achievements
| |
The table below contains a partial list of major contracts that
have recently been awarded to the OOSC Group of Companies.
|
|
|
Tuboscope |
Tuboscope - OOSC (Joint Venture)
www.nov.com |
-
3-year contract for GRE-lined tubular supply for PDO (2003 -
2006)
-
3-year contract for tubular running services for PDO (2003 -
2006)
|
 |
Virgo Valves - OOSC
www.virgoengineers.com |
Supply of
Ball valves from 2”-24” in MOC CS/SS316/SSs316L/Duplex
& St.Steel other exotic materials to various projects as
listed below:
-
PDO project Burhan Station Development
-
PDO project Barik Station Development
-
PDO Gas Group - project
-
PDO Harweel project to EPC Contractor Gulf Petrochemical
Services
-
Occidental of Oman, Safah
facilities, to EPC Contractor Dodsal
|
 |
Prosernat - OOSC
www.prosernat.com |
-
Saih Nihyadha LNG project PDO Lekhwair gas conditioning unit
|
 |
Prosernat - OOSC
www.prosernat.com |
-
Saih Nihyadha LNG project DEG / TEG dehydration unit
|
 |
AMEC - OOSC |
-
Sub stations for power plant & 190km of 132KVA lines
|
 |
Thomassen - OOSC |
-
PDO Maintenance contract for power generation equipments
|
 |
Solar Turbines - OOSC |
Supply of gas turbines and control systems for various
projects as listed below:
-
PDO's Yibal & Natih
fields-
Upgrading of existing control systems to new generation
of Turbotronic IV PLC based Controls for Centaur 40 gas
turbine driven compressor packages.
-
Occidental of Oman, Safah power plant-Titan 130 gas turbine generator sets.
-
Occidental of Oman,gas compression project-f
Taurus 60 gas turbine driven compressor sets.
|
 |
David Brown - OOSC
www.dbup.textron.com |
|
 |
Mafi Trench - OOSC |
-
PDO LNG projects turbo-expanders.
|
 |
CPTDC - OOSC
http://www.cptdc.com |
|
 |
Wood Group ESP - OOSC |
-
6-year major contract for the supply and service of
electric submersible pumps for PDO fields
|
 |
Weatherford Artificial Lift Systems |
-
4-year contract for the supply of progressive cavity
pumps and drive packages
-
Beam pump motors
|
 |
Hydril
www.hydrill.com |
-
Production and flow line choke valves
-
Pneumatically controlled choke valves
-
BOP and pulsation dampners
|
 |
Special Technical Services (STS)
www.stsoman.com |
-
4-year (2001-2005) DCME&I (Design, Civil, Mechanical,
Electrical and Instrumentation) service contract for PDO
(Qarn Alam & MAF Areas)
-
5 year (2005-2010) EMC (Engineering, Maintenance and
Construction) contract for PDO in northern Oman
-
Maintenance
service contracts for PDO-northern and southern
operations
-
Pipeline maintenance
service contracts for PDO- northern and southern
operations
|
 |
Oman Industrial Coating Centre (OICC) |
-
STS/PDO 4-year (2001-2005) DCME&I service contract, Qarn
Alam & MAF areas - painting and coating
-
Tuboscope/OOSC/PDO - Pipeline Internal Blasting and GRE
lining with Epoxy Mastic (3-year contract)
-
Al-Hassan/PDO 4-year (2001-2004) PDO North/ South Oman
campaign maintenance contract - painting and coating
-
Occidental of Oman (2003 - 2006) service contract for
painting and coating
-
CCC/OMIFCO (Oman India Fertilizer Co.) - painting and
coating at Sur (2003-2004)
|